| Demolition (entire structure) | $250.00 per story |
| Selective demolition | $0.25/sq. ft. (plan view); Minimum $250.00 |
| Temporary sign | $50.00 each (Town Manager approval required) |
| Permanent sign | $1.25/sq. ft.; Minimum $100.00 (includes one inspection) |
| Wood stove or chimney | $100.00 each |
| Zoning review (shed, fence, etc.) | $25.00 per structure |
| Temporary structure (less than 90 days) | $125.00 each |
| Reinspection | $50.00 each |
| Multi-family 110.7 Certificate of Inspection | $100.00 per dwelling unit |
| Mechanical/Sheet Metal | $7.00 per $1,000 contract price; Minimum $100.00 |
| Sprinkler system | $50.00 per inspection; Minimum $300.00 |
| Alarm system | $50.00 per inspection; Minimum $300.00 |
| Cell tower (new) | $7.00 per $1,000 contract price; Minimum $500.00 |
| Cell tower antenna change/install | $7.00 per $1,000 contract price; Minimum $300.00 |
| Generator | $7.00 per $1,000 contract price; Minimum $200.00 |
| Certificate of Inspection (all other businesses) | $100.00 each |
| Administrative fee (paper applications) | $10.00 |
| Work started before permit issuance | Double permit fee |