Building Permit Fee Schedule- Commercial, Business & Industrial Property
Fee Schedule as of July 1, 2026
All New Structures Permit
Includes up to 7 inspections
Fee: $8.00 per $1,000 of full contract price (Minimum fee $500.00)
The Above Fees are Based on ICC February 2026 Building Value Data (BVD)
Renovations of Existing Structures or Tenant Fit-out Permit
Includes up to 3 inspections
Fee: $8.00 per $1,000 of full contract price (Minimum fee $300.00)
*Commercial Roofing, Siding, Insulation, Replacement Windows or Doors Permit
Includes 1 Inspection
Fee:$10.00 per $1,000 of contract price (Minimum fee $200.00)
*Note: Any replacement or repairs that include structure are considered alterations
Solar / Photovoltaic Systems
Includes 2 Reviews and 1 Inspection
| Permit / Work | Fee |
|---|---|
| Panels (250 kW or larger) | $10.00 per $1,000 of contract price (Minimum fee $1,000.00) |
| Energy Storage Systems | $10.00 per $1,000 of contract price (Minimum fee $1,000.00) |
Demolition
Includes 1 Inspection
| Permit / Work | Fee |
|---|---|
| Entire Structure | $8.00 per $1,000 of contract price (Minimum fee $250.00) |
| Selective | $8.00 per $1,000 of contract price (Minimum fee $250.00) |
Cell Towers
| Permit / Work | Fee |
|---|---|
| New | $10.00 per $1,000.00 of contract price (Minimum fee $500.00) |
| Changing/installing Antennae |
$10.00 per $1,000.00 of contract price (Minimum fee $300.00) |
| Generator |
$10.00 per $1,000.00 of contract price (Minimum fee $200.00) |
Miscellaneous:
Includes 1 Inspection
| Permit / Work | Fee |
|---|---|
| Temporary Signs (Requires approval from Town Manager) | $50.00 Each |
| Permanent Signs (Requires approval from Planning Board) | $8.00 per $1,000 of contract price (Minimum fee $100.00) |
| Solid Fuel Appliance & Chimneys |
$8.00 per $1,000 of contract price (Minimum fee $100.00) |
| Zoning
review for shed, fences, etc. |
$25.00 per structure |
| Certificate of Inspection (COI) 110 & 304 |
Per Business, $100.00 each |
| Certificate of Inspections (CI) 110.7 Multi-Family |
$100.00 per dwelling unit |
| Temporary Certificate of Occupancy | $100.00 each |
| Amendments | $75.00 plus $8.00 per $1,000 additional contract price |
| Temporary Structures (Tent or similar structures) are less than 90 days
|
$125.00 each |
| Re-Inspections | $75.00 each |
| Mechanical/ Sheetmetal | $8.00 per $1,000 of contract price (Minimum fee $100.00) |
| Sprinkler System | $8.00 per $1,000 of contract price (Minimum fee $300.00) |
| Fire Alarm System | $8.00 per $1,000 of contract price (Minimum fee $100.00) |
| Administrative fee for all paper applications | $20.00 |
| Work before permit is issued | Double fee |