Building Permit Application Forms and Links

  • An Insurance Affidavit must be completed and returned with each Building Permit  Application 
  • Home Owner Exemption Forms must be completed by homeowners of 1 or 2 family- owner occupied-dwellings when the homeowner(s) are doing their own work. 
      • An appropriately Licensed Construction Supervisor is required for all other work  requiring permits on buildings under 35000 cubic feet in area.  
  • Work in Buildings over 35000 cubic feet in area require Construction Control, unless work is minor and the Building Official has waived the requirement or the building meets one of the exemptions of Section 107.6.1 in the Massachusetts Amendments. Completed Construction Control Forms must be returned with the completed Building Permit Application.

 

LINKS TO RELATED WEBSITES

State Office of Public Safety (OPSI) Office of Public Safety - Board of Building Regulations and Standards
State Board of Building Regulations and Standards Construction Supervisor Licensing
Homeowner License Exemption Form.pdf - Must be filled out when a homeower obtains the permit.
Workers Comp Affidavit .pdf - To be completed and filed with ALL permit applications
RESIDENTIAL SOLAR PV APPLICATION REQUIREMENTS AS OF 7-1-23.pdf INCLUDE THIS COMPLETED CHECK LIST WITH THE APPLICATION FOR RESIDENTIAL SOLAR PV INSTALLATIONS
Pellet Stoves, Wood Stoves, Coal Stoves, Prefabricated Chimneys, Chimney liners etc Pellet Stoves, Wood Stoves, Coal Stoves, Prefabricated Chimneys, Chimney liners etc
1 or 2 FAMILY-POOL FENCING REQUIREMENTS 8th Edition Code.pdf pool barrier requirements for above ground or inground private pools for 1 or 2 family homes